Construction Process

Step 1: Excavation – Dig Elevator Pit & Ready for Rebar Placement

IMG_1610

Step 2: Rebar – Placement of Steel Rebar & Ready for Concrete Forms

IMG_3021

Step 3: Forms – Construction of Wood Forms & Get Ready for Concrete

Step 4: Concrete – Concrete Poured, Forms Stripped & Ready for Steel Tower

 IMG_3023

Step 5: Steel Tower – Steel tower is erected with columns and is ready for wood framed hoist way

 IMG_3040

Step 6: Exterior – Hoist-way is Complete with Stucco Adding Finishing Touches to Match Existing Structure

 IMG_3031

Step 7: Machine Room – Where Elevator Equipment, Electrical Disconnects ETC. are Placed

IMG_3030

Step 8: Elevator Installed and Ready for State Inspection

Step 9: Finished Product

IMG_3029